Every approved land order carries its own list of the records it changes, and stays open until each one confirms.

The officer approves the change in Dharitree as today. Bhumi Sync turns it into lines for each affected system, follows each line to a receipt, and marks the dag as in transit until the last one is in.

01In one minute

Four steps, from approval to the last receipt

02What changes

Today, and with Bhumi Sync

Today
With Bhumi Sync
Knowing what to update
The officer and staff work out which other records a partition affects, from experience.
The rulebook lists them for each type of change. The Department approves it once.
Starting each update
Started separately in each system, by whoever remembers it.
Every line is opened in its system, in the right order, the moment the order is approved.
Knowing it was done
Assumed, until something goes wrong.
Each line comes back with the receipting system's own reference. Missing receipts are chased.
The weeks in between
Other systems show the old record as if it were current.
The dag shows "in transit" wherever it's read, with what's done and what's pending.
Old mismatches
Found during a citizen's next application, or in a clean-up drive.
Mouzadars, Sub-Registrars, Lat Mandals and banks report them back as they meet them.
The family
Learns of a missed update at the next sale or loan.
Gets an SMS with a link that shows which records have changed.
03The challenge, point by point

What the Department asked for, and where to see it

The challenge asks forWhat Bhumi Sync does
An interoperable mechanism linking the land-record systemsOne adapter per system (Dharitree, Bhunaksha, NGDRS, e-Khajana, Property Chain, SMS), each working through that system's own interface or a tracked operator task.See it
An approved change automatically identifies all other records needing updateThe rulebook for the change type produces the order's full list of lines the moment Dharitree approves it.See it
…and triggers the appropriate workflowEach line opens a task in its system, in dependency order, and is followed to a receipt.See it
Human approval retained wherever prescribed by lawLines marked "officer signs" or "field, then officer" wait for that person. Changing a line's type needs a new rulebook version approved by the Department.See it
Consistent records, fewer discrepanciesAn order closes only when every receipt is in. Downstream users report old mismatches back to the Circle Office.See it
Faster service, stronger citizen confidenceThe family follows its own order on a tracker. Other systems show "in transit" instead of an out-of-date record.See it
Pilot on mutation or partition in selected circlesWe propose partition, because it touches the most systems, while sale mutation already has auto-mutation.See it
Detailed breakdownThe rulebook · Workflows · Architecture and security · Discovery
AThe rulebook

Which records each change touches, and who acts

Each type of change has one row. Each cell says what kind of line that system gets. The Department approves every version, and every order records which version produced its list.

A first draft. The real entries depend on the Assam Land and Revenue Regulation, 1886, the Registration Act, 1908, the Department's orders and how each system works today. We'd settle them with the Department in the first three weeks.

BWorkflows

A partition, from approval to the last receipt

Circle Officer
Approves in Dharitree
As today. Bhumi Sync picks up the approved order within minutes.
Bhumi Sync
Writes the list
Eight lines from the partition rulebook, each with its dependencies.
Lat Mandal, then CO
Map first
The subdivision is drawn from the case sketch, then approved. ULPINs follow.
Mouzadar, CO, systems
The rest in parallel
Revenue split, patta copies, NGDRS, bank. Each sends its receipt.
Bhumi Sync
Closes the order
Property Chain gets the final state. The "in transit" notice is removed.

A mismatch reported back

Mouzadar, SRO or bank
Presses "doesn't match"
Gives the dag, what their record says, and attaches a photo or reference.
Bhumi Sync
Adds the other side
Puts Dharitree's current entry next to it, with any open order on that dag.
Circle Officer
Decides the path
A fix through the usual correction case, the resurvey list, or "no mismatch".
Bhumi Sync
Tells the reporter
The outcome goes back to whoever reported it.

No AI decides anything here. The lines come from written rules, and the officers make every judgement.

CArchitecture

Built on the platform we already run

Roles, approvals, notifications and audit already run in production in Vrixaa Connect, our live platform. Bhumi Sync adds the order lines, the receipts and the adapters. It can be hosted on the State Data Centre or a MeitY-empanelled cloud in India.

People
Circle Officers
Lat Mandals
Mouzadars
Directorate of Land Records
Co-pattadarsby SMS link
Apps
Web app for officers
Android appLat Mandal, Mouzadar; works offline
Citizen trackermobile web, OTP
Status service"in transit" for other systems
Core
Order intake
Rulebookversioned, Department-approved
Line followerdependencies, reminders, receipts
Reports back
Audit logappend-only
Data
PostgreSQL + PostGIS
Order and receipt store
Outbox per systemnothing lost or sent twice
Connects to
Dharitreeapproved orders, read only
Bhunaksha & ULPIN
NGDRS
e-Khajana
Property Chain
SMS gateway

Each line, exactly once

Every line has a key made of the order and the system. A retry can't apply a change twice. Lines for the same dag run in order.

Three ways to connect

An API where one exists, a file exchange where it doesn't, or a tracked task for the system's operator. A line can move from one to another without changing the order.

Access by role and circle

Officers see their circle's orders. Mouzadars see their mouza's lines. Sign-in by OTP, with a second factor for officers.

Personal data kept small

Only what the land records already hold, plus co-pattadars' mobile numbers for SMS. Citizens see only their own order after OTP. Designed for the DPDP Act 2023.

DDiscovery

What we'll settle with the Department in the first three weeks

The design rests on the challenge statement and on public information about Dharitree, NGDRS, Bhunaksha, e-Khajana and Property Chain. These are the points we'll confirm with the Department and NIC before building the production system.

  • How a partition reaches Bhunaksha today, and who draws the subdivision.
  • Whether e-Khajana splits the revenue demand on its own after a partition, or the Mouzadar does it.
  • What each system can offer: an API, a scheduled export, or an operator task to begin with.
  • Which lines the law or Department orders reserve for an officer, change type by change type.
  • How Property Chain's Darrang pilot accepts updates, and whether ULPINs exist in the pilot villages.
  • Which pilot circles, and whether banks join as a receipt line from the start.